Oversize Haulage Brisbane
Compliance-led oversize specialist for complex SEQ moves over 2.5m wide — Class 1 permits, route surveys, curfews and pilot escorts, planned per load.
Get a free quote
Tell us the load, the dimensions and the pickup-to-delivery route. Fill in the manifest below — we'll come back with the right trailer, the permit plan and a free quote for your Brisbane or SEQ move.
Compliance-led oversize, not tow-truck recovery
Brisbane Oversize Haulage is a compliance-led oversize specialist for complex moves over 2.5m wide across Brisbane and South East Queensland. Once a load crosses 2.5m — wide, over-height, long or over-mass — it becomes a Class 1 restricted access vehicle move that needs an NHVR access permit, a route survey, curfew management and a sized pilot escort plan. That's the work we do: excavators, cranes, precast, structural steel, transportable buildings, transformers, mining equipment and wide loads, planned end to end with the trailer, the permit, the route and the pilot handled as one job.
We're not a tow-truck recovery service, a general freight carrier, or a pilot-only booking desk — we're the SEQ oversize specialist for the moves that need a permit and a plan, not just a truck. The difference between a clean oversize move and a stalled one is compliance, not horsepower. A load over 2.5m wide without a permit and pilot doesn't travel. An over-height load on the wrong route hits a bridge. A heavy load on the wrong trailer overloads the axles. We plan against those failure modes before the truck rolls.
What makes a move oversize in Queensland
In Queensland a load becomes restricted-access once it exceeds the statutory dimension thresholds — most commonly 2.5m wide, 4.3m high, or 19m long for a standard combination, with mass limits set by axle group. Past those thresholds the load is a Class 1 restricted access vehicle (RAV) and cannot legally travel on a public road without an NHVR access permit. Over-width past 3.5m, over-height past 4.6m, and over-mass past standard axle loads each add layers of permit condition, pilot requirement and route restriction.
The first question on every oversize enquiry is never "what's it weigh" alone — it's the full dimension and mass picture, because that determines the permit class, the trailer, the route and the escort. Send us the width, height, length and weight and we'll classify the move from there.
Class 1 permits and NHVR access
Every oversize move over 2.5m wide needs a Class 1 access permit issued through the NHVR before it can travel. The permit specifies the route, the travel conditions, the curfews and the escort requirements for that specific load on that specific corridor. We classify the load against the thresholds, prepare the permit application with the load dimensions, mass and trailer combination, and lodge early.
Permit lead time often governs when a move can actually happen, and bridge assessments for the heaviest loads can take one to two weeks or more. We don't dispatch on a "she'll be right" — we dispatch on an issued permit, with the route and the curfew locked in before the truck leaves the yard.
Route surveys and bridge ratings
A permit is only as good as the route under it. Before we commit a corridor we survey it against the load: overhead clearances (bridges, viaducts, signs, wires), swept path at roundabouts and interchanges, bridge and culvert ratings against the load's axle weights, and the road geometry that governs a long or wide combination.
SEQ's pinch points are well known — the Gateway and Logan Motorway interchanges, the Western Freeway tunnel clearances, the Toowoomba range crossing, the M1 bridge heights — and we plan around them rather than discovering them on the day. Where a route is ruled out by clearance or rating, we revise before we lodge, not after.
Curfews and travel windows
Most SEQ oversize permits restrict travel to daylight hours, ban school-zone periods, and limit the route to off-peak windows outside the 6:30–9:00am and 3:30–6:30pm commuter peaks. Some corridors and some loads add night-only or specific-window conditions; event periods (race weekends, major events) can shut a route down entirely.
We schedule the move into the permit's allowed window and around the corridor's real traffic — the load travels when the corridor allows, not when the truck is free. Curfew management is part of the plan, not an afterthought.
Pilot escorts, sized to the load
Pilot escort requirements scale with the load: over-width past 3.5m typically needs one pilot, past 4.5m two, and the widest and heaviest moves need a police escort as well. We size the pilot plan to the load and the route — not a default one-pilot booking — and we coordinate the pilot, the permit window and the site access so the whole convoy moves as one.
For standalone pilot escort needs, we refer to a specialist partner at brisbanepilotescort.com.au. See our pilot escort page for how we integrate escorts into an oversize move.
The SEQ corridors we know
Our service area is Brisbane and SEQ — no further. We know the corridors: the Port of Brisbane discharge windows and the Gateway outbound, the Acacia Ridge–Richlands heavy vehicle belt, the Gateway and Logan Motorway (M1/M6) interchange geometry, the Ipswich Motorway (M7) and the Warrego range crossing to Toowoomba, the Yatala–Logan M1 corridor south to the Gold Coast, the Wacol–Sumner–Darra western belt and its tunnel clearances, and the Bruce Highway north to the Sunshine Coast and Caboolture.
Each corridor has its own pinch points, clearances and curfews, and we plan against them per load — not a generic SEQ route, but the specific road the load will actually travel.
What we move
Excavators and earthmoving plant, cranes, precast panels and beams, structural steel, transportable and modular buildings, transformers and substation plant, mining equipment, agricultural machinery, and wide and over-dimensional loads — the complex moves over 2.5m wide that need a permit and a plan. The common thread isn't the cargo type, it's that each one is restricted-access and needs the compliance chain handled as one job.
How we're different
We're not a pilot-only booking service, a container haulier, a statewide heavy haulage operator, or a generic heavy transport site. We're the SEQ oversize specialist — compliance-led, corridor-specific, and focused on the complex moves over 2.5m wide that need a Class 1 permit, a route survey and a sized pilot plan.
We cover Brisbane and SEQ only: the Port of Brisbane, Acacia Ridge, Ipswich, Wacol, Yatala–Logan, the Gold Coast, the Sunshine Coast, Toowoomba, Caboolture and the Redlands. If your move is in Brisbane or SEQ, we plan it. If it isn't, we'll tell you.
Service hub
The oversize, plant and compliance pages that cover most SEQ moves — each breaks down the load, the trailer, the permit and the escort plan.
Oversize Transport
Over-dimensional haulage — wide, tall and long loads across SEQ.
Read moreLow Loader
The workhorse for plant and over-height loads.
Read moreExcavator Transport
Earthmoving and construction plant moves, permitted and escorted.
Read moreMachinery Transport
General machinery haulage on low loaders and floats.
Read moreWide Load Transport
Loads over 2.5m wide — permits, pilots and curfew planning.
Read moreOver-Dimensional Transport
Out-of-gauge cargo engineered, permitted and escorted.
Read morePermits & Compliance
Class 1 NHVR access, route surveys and escort planning.
Read moreHow a planned move works
Tell us the load
Load type, dimensions, weight and the pickup-to-delivery route. The more detail, the tighter the plan.
We match the trailer
Low loader, extendable drop deck or platform float — selected against your load, not a default.
Permit & escort plan
NHVR access permit, route survey, bridge ratings and the pilot escort plan sized to the load.
We move it
Scheduled around SEQ peaks, school zones and port/site windows — the load travels when the corridor allows.
Fleet overview
Four trailer families, matched to the load. Indicative specs only — final selection is per load.
SEQ corridor hubs
Five genuine SEQ industrial corridor pages — each breaks down the industrial areas, the likely loads and the route, permit and escort considerations for that part of SEQ.
Yatala–Logan
M1 Pacific Motorway corridor — precast, modular buildings and plant.
Read moreIpswich
Ipswich Motorway & Warrego — civil earthworks, precast, ag and mining outbound.
Read morePort of Brisbane
Wharf pickups, Pinkenba and the Gateway corridor — transformers and project cargo.
Read moreWacol
Wacol–Sumner–Darra western belt — steel, precast and manufacturing.
Read moreToowoomba
Warrego & range crossing — mining, ag and transformers to the west.
Read moreAll SEQ locations
We cover Brisbane and SEQ only — no statewide location farm, no doorway pages for places we don't service. If your move is in Brisbane or SEQ, we plan it. If it isn't, we'll tell you.
Guides
Practical, plain-English guides to planning an oversize move in Brisbane and SEQ — curfews, permits and equipment. General planning information, not legal advice.
Wide Load Curfews
Curfews, peak-hour and night-travel windows across Brisbane and SEQ — general planning info, not legal advice.
Read guideQLD NHVR Class 1 Permit Guide
How to prepare a Class 1 oversize permit request — dimensions, axles, route, escorts and consent.
Read guideLow Loader vs Tilt Tray
Education-only comparison of loading geometry, access, clearance and load types.
Read guideSee the full guides hub for more.
What areas does Brisbane Oversize Haulage cover?
We cover Brisbane and South East Queensland only — including the Port of Brisbane, Acacia Ridge, Ipswich, Logan, Yatala, the Gold Coast, the Sunshine Coast, Toowoomba, Caboolture and the Redlands. We don't run a statewide location farm and we don't service Bundaberg, Cairns, Townsville, Mount Isa or Roma.
What counts as an oversize or OSOM load?
A load is oversize when it exceeds standard dimension limits — typically width over 2.5 metres, height over 4.3 metres, or significant rear overhang. OSOM (Over-Size Over-Mass) loads also exceed mass limits and need a National Heavy Vehicle Regulator (NHVR) access permit, a route survey and usually a pilot escort plan.
Do you organise permits and pilot escorts?
Yes. We arrange NHVR access permits, route surveys, bridge and pavement rating checks where needed, and the pilot escort plan sized to the load's width, height and mass. For the largest OSOM moves we coordinate traffic management and police escort. Permit lead time often governs when a move can travel, so we book early.
What trailer do I need for my load?
It depends on the load's weight, width, length and height. Low loaders suit most earthmoving plant and over-height items; extendable drop decks suit long structural steel and precast; platform floats with dollies and steerable rears suit heavy transformers and mining modules. We confirm the right trailer against your dimensions and weight when you request a quote.
How much notice do you need for an oversize move?
It depends on the permit and escort requirements. A straightforward oversize move may need a few days' notice; an OSOM move with a route survey, bridge rating check and multi-pilot plan can need one to two weeks or more. We'll tell you the realistic lead time when you request a quote.
Got an oversize move to plan?
Tell us the load, the dimensions and the route. We'll come back with the right trailer, the permit plan and a free quote for your move.
